Contract Name

Brief of Consultancy Services Provided

1     

Supervision and Coordination of Works for Sewer and Water Connections for

Nairobi Informal Settlements.

To provide professional services in Construction Design, Works Supervision and coordination of construction of:

  • 2.8 km of 225 mm diameter concrete s/s sewer lines and its auxiliaries to connect 10 ablution blocks to the existing sewer line
  • 3.9 km of DN19mm diameter GI Pipes to connect 10 ablution blocks and 13 water kiosks to the existing water lines.

2       

Landscape Analysis and Business Model Assessment in Faecal Sludge Management: Extraction and Transportation Models in Africa.

Conduct research, review and analyze data on the extraction, transfer and transportation of faecal sludge in order to advise on the status of faecal sludge management in the three selected cities with special focus on the governance, management, business and operating models.

3      

Technical Audit of 66 Selected Projects in Kenya Funded Through Water Services Trust Fund

This included WASH (UNICEF), CPC, WDC and MTAP programmes

  • Assess the quality of workmanship in the projects.
  • Verify the quantities used in the works as per the Bills of quantities.
  • Assess the performance/sustainability of the completed project.
  • Assess the appropriateness of technology.

4      

Tariff Study for   Kakamega - Busia Water Company Ltd

Preparation of tariff proposal for submission to WASREB, Identification of areas of weaknesses, Identification of services offered by reviewing past studies.

5      

Consultancy Services For Mid-Term Review Of The Performance Of Five Licensed Water Services Boards

This assignment aimed at evaluating the water services boards’, as per the mandate of WASREB, in section 47e of the Act:

·         Compliance with the requirements of the Water Act 2002;

·         Compliance with the requirements of the license conditions and guidelines issued there under; and

Performance of the licensee with the business plans submitted which incorporates progress with the capital works plan, the financial plan and the viability/sustainability plans.

6   

Value for money Study For Twenty Urban Water Projects

This assignment aimed at improving the quality, cost effectiveness, accountability and administrative transparency of the implementation process of urban water and sewerage projects in Kenya by identifying strengths and challenges in the implementation of the current projects and in the way the procedures are followed and to provide recommendations on how to address any weaknesses/challenges identified during the study.

7

Infrastructure Design and Supervision Services for Sub-division of Plot LR 4927 Kamiti, Nairobi.

Detailed designs and tendering. Obtain approval of the designs by the relevant authorities and subsequent site supervision and co-ordination of works.

8   

Consultancy for identification of implementation and management arrangements for improved water & sanitation services to informal settlements in Kisumu.

Develop an appropriate model for water supply and sanitation

Build a strategy that incorporates the behaviour patterns in the study area an implementation framework with simple, clear and achievable indicators for monitoring and evaluation

9   

Consultancy Services to Develop Scheme of Service and Human Resource Policy for Kakamega - Busia Water Supply.

Desk Study and Review  of the  existing organizational structure, establishment of; job functions, number of job levels, reporting structure, the organizations grading, establishing performance measures, developing schemes of service and preparing report.

10   

Tariff Study for Nakuru water and sanitation company.

Preparation of tariff proposal for submission to WASREB, Identification of areas of weaknesses, Identification of services offered by reviewing past studies.

11   

Tariff Study for   Kakamega - Busia Water Company Ltd

Preparation of tariff proposal for submission to WASREB, Identification of areas of weaknesses, Identification of services offered by reviewing past studies.

12   

EIA and RAP for Decommissioning of Dandora Dumpsite and Construction of Sanitary Landfill in Ruai.

Ecological survey and Soil and geological survey, environmental impacts, Traffic assessment, Socio-economic survey, Hydro-geological survey,

estimation of leach ate quantity and quality.

13   

Consultancy Services for Review of Malindi Water and Sewerage Company Strategic Plan (2007-2012).

Review the Strategic Plan and prepare communication policy for the company, investigate the implementation and impact of the strategic plan for MAWASCO, Review of business plan to determine the effectiveness in meeting the company’s goals.

14   

Consultancy Services for Tariff Study for the Bulk Water Supply and Water Services Providers (WSPs) in the Coast Water Services Board.

Desk research on government regulations on tariff reviews, past performance of CWSB, review of SPA and tariff request proposals, field visits, interviews and discussions, conducting socio-economic surveys targeting consumers, analyzing investment requirements and overheads and analyzing data to guide the Consultant to make necessary projections necessary to develop an appropriate tariff structure for CWSB and WSPs.

15   

Aeronautical Survey and Bird strike Potential at Jomo Kenyatta International Airport, Nairobi.

Collect baseline information of the proposed dump site in Ruai and JKIA, establish the densities of particular bird species in areas surrounding JKIA and the proposed site for constructing a sanitary landfill, determine potential bird strike threats to aviation at JKIA triggered by the construction of a sanitary landfill in Ruai and propose mitigation measures for significant negative impacts to aviation caused by birds.

16   

Tariff Study for Nzoia water and sanitation company.

Preparation of tariff proposal for submission to WASREB, Identification of areas of weaknesses, Identification of services offered by reviewing past studies.